To start hanging sheetrock pick a starting point and work your way along the wall.
Sheetrock on basement floor.
The joists may not be perfectly spaced and you only have a 1 1 2 inch target for attaching two edges of the drywall.
This helps to point out the line.
For sheet rubber in rolls.
Use your screw gun to secure each board with five 1 inch drywall screws along each stud that the board crosses.
Tape a one foot by one foot square of plastic sheeting plastic kitchen wrap will do to the concrete wall in your basement with duct tape and leave it in place for 24 hours.
If you want a tile floor that isn t cold underfoot put down a basement subfloor before you install your tile.
We have a dry basement with a concrete floor.
Rubber tile or rubber sheets 3 8 sq.
When putting on the wall boards how much if any gap should there be between the concrete floor and the bottom of the board.
This helps keep them properly aligned.
As well the floor joists are often not perfectly on the same plane with one or more of the floor joists being slightly lower or higher than the others that is why so many people put 1x3 or even 1x4 strapping on the ceiling.
Plastic will prevent moisture from moving through the wall.
This joint where your basement wall and floor meet is known as a cove joint.
The best flooring for a basement is vinyl or laminate which should be installed as a floating floor to allow for changes in the concrete caused by moisture and temperature.
For tiles and 1 5 sq.
A common question people have when finishing a basement is should i use visqueen or plastic sheeting on one side or the other of the framed basement walls the answer is no.
As we mentioned earlier the basement is naturally humid because of its lower location.
Measure the dimensions and mark them for basement drywall installation.
Then remove the tape.
Mark the location of studs they should be 16 inches apart.
It exists due to the way that a home s foundation is poured.
Yes you can but it is not always easy to do.
You ve probably seen this resilient flooring in health clubs and gyms.
Some parts of the ceiling in basement might need small pieces of drywall or sheet rock.
The boards are 3 8 inch i was thinking about using a.
For square or rectangular pieces of drywall use a tape measure for a straight edge.
Hang wallboard so that the 8 foot side runs horizontally and start from the top down.
After your foundation footings are built your basement walls are poured so that they slot into a keyway.